• Home
  • About
  • Projects
  • Press
  • Contact
  • Links
Menu

Urbana Real Estate Development, LLC

425 E. 4th Street, Unit C
Long Beach, CA, 90802
(562) 436-5220
Creating successful built environments

Your Custom Text Here

Urbana Real Estate Development, LLC

  • Home
  • About
  • Projects
    • Airway Office Park
    • SA Properties (Harbor Freight BTS)
    • Laserfiche Office
    • The Terminal
    • Metro Ports Office Building
    • Douglas Park Medical Office II
    • Douglas Park Medical Office I
    • Psychic Temple
    • East Village Creative Offices
  • Press
  • Contact
  • Links
lindseying-151011-28-2.jpg

Metro Ports Office Building

Metropolitan Stevedore's new corporate office is a 40,000 square foot concrete tilt-up located in Douglas Park, Long Beach.

It features enhanced architectural elements and has an exterior amenity area designed for employees and corporate events.

In addition, the parking lot includes solar covered parking stalls designed to generate over 385,000 kWh per year. The covered parking area also includes electric car charging stations for employees.

The building was designed to a LEED Silver standard and reflects the company's strong commitment to the environment and green initiatives.

The project was designed by DRA Architects. The building was completed in February 2016.

To view construction photos of this and other projects click here.

Metro Ports Office Building

Metropolitan Stevedore's new corporate office is a 40,000 square foot concrete tilt-up located in Douglas Park, Long Beach.

It features enhanced architectural elements and has an exterior amenity area designed for employees and corporate events.

In addition, the parking lot includes solar covered parking stalls designed to generate over 385,000 kWh per year. The covered parking area also includes electric car charging stations for employees.

The building was designed to a LEED Silver standard and reflects the company's strong commitment to the environment and green initiatives.

The project was designed by DRA Architects. The building was completed in February 2016.

To view construction photos of this and other projects click here.

lindseying-151011-28-2.jpg
lindseying-151011-8-2.jpg
lindseying-151011-36-2.jpg
lindseying-151011-21.jpg
DSC_7617.jpg
Screen Shot 2014-07-23 at 10.14.18 PM.png

Copyright Urbana Real Estate Development, LLC 2024

Powered by Squarespace